L-BAR SEALER BUYER CHECKLIST Prepared October 1, 2026 | https://lbarsealer.com/buying-guide/ This is a requirements brief, not a compatibility determination. Mark each answer KNOWN / TO CONFIRM WITH SUPPLIER / NOT APPLICABLE. PRODUCT [ ] Product description and representative samples: ___________________ [ ] Minimum L x W x H: __________________ Units (in / mm): _____________ [ ] Maximum L x W x H: __________________ Units (in / mm): _____________ [ ] Weight and units: __________ Travel orientation: __________________ [ ] Variation, loose components, sensitivity, desired appearance: ______ [ ] Seal area needed (front x side bar): ________ Max height: _________ PRODUCTION [ ] Required good packs per shift: __________ Peak demand: ____________ [ ] Available run time per shift: ___________ Staffing: ________________ [ ] Required packs per minute (packs / run minutes): __________________ [ ] Current process and bottleneck: ___________________________________ [ ] Product changeovers and loading/unloading method: _________________ FILM [ ] Film type (polyolefin / PVC / polyethylene): _____________________ [ ] Supplier and grade: _______________________________________________ [ ] Thickness and units: __________ Roll width and units: _____________ [ ] Core diameter: ________________ Roll outside diameter: ____________ [ ] Centerfold width (W + H + 2 to 4 in.): ____ Perforation: __________ [ ] Compatibility and trial material to confirm with supplier: ________ UTILITIES AND LAYOUT [ ] Available voltage: ______ Phase: ______ Circuit capacity: _________ [ ] Available compressed air (if any): ________________________________ [ ] Installation footprint with units: _______________________________ [ ] Infeed/outfeed heights: __________ Access route: __________________ [ ] Supplier-confirmed operator/service clearances: ___________________ [ ] Supplier-confirmed sealer/tunnel utilities and integration: ________ BUDGET AND INSTALLATION [ ] Budget range and currency: _______________________________________ [ ] Quote includes sealer / tunnel / conveyors / options: ______________ [ ] Freight, taxes, unloading, positioning responsibilities: __________ [ ] Utility connections, commissioning, training responsibilities: _____ [ ] Film, initial spares, consumables, and service scope: ______________ SUPPORT AND ACCEPTANCE [ ] Parts availability and consumable part numbers: __________________ [ ] Warranty coverage/exclusions and service response: ________________ [ ] Manuals and training provided: ___________________________________ [ ] Factory test before shipment (FAT) agreed: ________________________ [ ] Site test after installation (SAT) agreed: ________________________ [ ] Run with representative products and intended film: ______________ [ ] Target rate, good-pack criteria, and trial duration: ______________ [ ] Good packs, rejects, settings, changeovers, staffing recorded: _____ [ ] Acceptance criteria written into the purchase order: ______________ [ ] Supplier written confirmation of complete application fit: ________ OPEN QUESTIONS FOR SUPPLIER _____________________________________________________________________ _____________________________________________________________________ Supplier / contact: __________________________ Date: _________________ Model / configuration / quote reference: ______________________________